Project 4G63T PG1 Updated
- scientist
- moderator

- Posts: 4599
- Joined: Mon Aug 13, 2007 1:31 am
- scientist
- moderator

- Posts: 4599
- Joined: Mon Aug 13, 2007 1:31 am
Re: Project 4G63T PG1 Updated
Started bolting up the drive shaft and realised the bushings are missing. So after a call to tunersnations project VR4 now has some Billet drive shaft bushings on the way.
Right now i'm in the middle of organizing the garage so things are moving at a snails pace.
Right now i'm in the middle of organizing the garage so things are moving at a snails pace.
/////////Ralliart
- scientist
- moderator

- Posts: 4599
- Joined: Mon Aug 13, 2007 1:31 am
-
ceelos
Re: Project 4G63T PG1 Updated
I hear that this car has been secretly been worked on..... Its ready to hit the road.....
-
TheGoodGuy
- You can't stop posting can you

- Posts: 1543
- Joined: Fri Mar 14, 2008 11:24 am
Re: Project 4G63T PG1 Updated
lol you guys need to stop giving project car blue balls. Just teasing without out giving up nothing.cee wrote:I hear that this car has been secretly been worked on..... Its ready to hit the road.....
"Its not the size of the engine that matters... its how much shit you can bolt to it....."


- club4g63
- You can't stop posting can you

- Posts: 1033
- Joined: Sat Aug 25, 2007 8:27 am
Re: Project 4G63T PG1 Updated
so them mitsu's on the bayfront later? galants and evo?
- scientist
- moderator

- Posts: 4599
- Joined: Mon Aug 13, 2007 1:31 am
Re: Project 4G63T PG1 Updated
Ok so its been way too long since i've updated this thread. The car has been parked as I've had other priorities and things to deal with.
I have decided to resume and began stitching together my braking system as this always needed an overhaul on the car.
I've started by replacing some of the hardlines that were utilized by the ABS system and decided to perform a brakeline tuck while I'm at it.
Incase anyone is planning on doing it.
i used:
3/16 brake hardline

-3an Hardline nuts/sleaves

-3an bulkheads

-3an Union fittings
Pipe Cutter
Double Flare tool
Pipe bender
They should be here within the next two weeks.
Once those are done, I remain a bit of work on the power steering system and purchase some tires.
Will be back to update soon
I have decided to resume and began stitching together my braking system as this always needed an overhaul on the car.
I've started by replacing some of the hardlines that were utilized by the ABS system and decided to perform a brakeline tuck while I'm at it.
Incase anyone is planning on doing it.
i used:
3/16 brake hardline

-3an Hardline nuts/sleaves

-3an bulkheads

-3an Union fittings
Pipe Cutter
Double Flare tool
Pipe bender
They should be here within the next two weeks.
Once those are done, I remain a bit of work on the power steering system and purchase some tires.
Will be back to update soon
/////////Ralliart
-
TheGoodGuy
- You can't stop posting can you

- Posts: 1543
- Joined: Fri Mar 14, 2008 11:24 am
Re: Project 4G63T PG1 Updated
"Its not the size of the engine that matters... its how much shit you can bolt to it....."


-
motion sickness
- Power Junkie

- Posts: 767
- Joined: Tue Aug 14, 2007 11:19 pm
Re: Project 4G63T PG1 Updated
Good...whats the ETa for the road test?
- scientist
- moderator

- Posts: 4599
- Joined: Mon Aug 13, 2007 1:31 am
Re: Project 4G63T PG1 Updated
All depends on how soon things get here.motion sickness wrote:Good...whats the ETa for the road test?
Shouldn't take me more than a day to fab up the brake lines.
Not more than a day to get the engine back in and wired up.
A bit more to deal with a few other little quirks and then to fire her up.
I've started putting some of the other requirements in as i prep for the brake lines.
/////////Ralliart