Project Response 2

Turbo Projects, Brake Swaps, Engine Swaps, Tranny Swaps etc, post them here. ONLY FULLY DOCUMENTED PROJECTS PLEASE
ceelos

Re: Project Response 2

Post by ceelos »

Patiently.....

User avatar
scientist
moderator
moderator
Posts: 4599
Joined: Mon Aug 13, 2007 1:31 am

Re: Project Response 2

Post by scientist »

Cee is preparing to install his engine.

the flywheel has been modified, the manifolds haven't returned from the machine shop. He'll update the thread with pics and progress
/////////Ralliart

ceelos

Re: Project Response 2

Post by ceelos »

Yes Guys as was previously mentioned the Long awaited Clutch did arrive. Flywheel was brought to the machine shop to modify and was fitted on afterwards, and torqued to 98 nM (yes with locktight) We now in the process of torquing it down the clutch. Engine and gearbox already together. Transfercase is on as well.. Waiting on the Turbos from the machine shop, the manifolds are being ported before we place them on. Stock exhaust was removed as well from the car in preparation for the install of the new one. Engine Bay was cleaned as best as Kian (White Evo5) and Myself could.. All in all we are moving as best as we can looking forward to the finish line....

User avatar
scientist
moderator
moderator
Posts: 4599
Joined: Mon Aug 13, 2007 1:31 am

Re: Project Response 2

Post by scientist »

Image
/////////Ralliart

User avatar
damien
You can't stop posting can you
You can't stop posting can you
Posts: 1336
Joined: Sat Sep 02, 2006 1:25 pm

Re: Project Response 2

Post by damien »

You brought the flywheel to a machine shop in Russia???
Image

ceelos

Re: Project Response 2

Post by ceelos »

yup a red russian from town who happens to be one of the member's of ODO's fada..

NE ways We finally got the clutch bolts in. Just to be torqued down properly will be done tomorrow afternoon, the gearbox bolts will be torqued as well. We will do a few finishing touches while we wait for the turbos to be ready from the "russian" Shop (blame Damien for that name).. All in all I'm happy with the progress so far...

TheGoodGuy
You can't stop posting can you
You can't stop posting can you
Posts: 1543
Joined: Fri Mar 14, 2008 11:24 am

Re: Project Response 2

Post by TheGoodGuy »

there is a Russian machinist in Dominica? .. how comes my father never mentioned that to me before...he musta known the guy.
"Its not the size of the engine that matters... its how much shit you can bolt to it....."
Image

ceelos

Re: Project Response 2

Post by ceelos »

I've imported an engine cleaning specialist and the engine was cleaned this evening.. Nuff props to the specialists on that part of the project [buddy] [buddy]

User avatar
scientist
moderator
moderator
Posts: 4599
Joined: Mon Aug 13, 2007 1:31 am

Re: Project Response 2

Post by scientist »

Kian again?
/////////Ralliart

ceelos

Re: Project Response 2

Post by ceelos »

no not Kian..

Post Reply