So here is a long list of updates I haven't posted..
Lets see..
I brought the new cylinder head to the machine shop, had new valve guides installed, 5 angle valve job, surfaced, and cam buckets shimmed..
Then I bought the block to the machine shop. Had it hot tanked, honed, surfaced, painted, new freeze plugs installed, new piston rings matched up, piston skirts coated, crank polished, and everything blue printed.. They also put the pistons, rods, and crank in for free

Started up first time... I had to spend a lot more timing fixing various leaks though...
Got everything back installed and getting ready to add the 1000cc injectors.. (ignore the duct tape lol.. and yes it's still there..

)
Installed those, then temporarily added a Z32 maf with 3" piping.. I couldn't tune it properly so I ended up removing it.. I think it's broken..
Took some pics of how it sites with z32 rear wheels in the front and back..
On my way home I had an electrical issue with the alternator..
I ended up wiring some plug backwards which killed 2 alternators.. I bought another engine for $100 and used the alternator from it.. Some guy is picking it up today for $350..
Made a new positive wire for the alternator using some 2 gauge wire.
Now I started on some LED front turn signals.. They are going to be half white/half amber.. The white will be the park lights and amber will be the turn signal.. (the white LEDs are the larger ones with the yellow inside)
Almost done wiring it up..
I think this is all for now.. I'll start taking more pictures and updating this more often..
Here are some plans though:
New intercooler piping and downpipe
Get it tuned